ETD - UIR

Electronic Thesis and Dissertation

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Member Area
    Member Login Online Registration
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject NPM Advanced Search

Last search:

{{tmpObj[k].text}}
Image of Evaluasi Penerapan Hydraulic Pumping Unit pada Sumur-sumur Berlaju Alir Rendah untuk Mempertahankan Produksi Minyak di Sumur X1, X2 Dan Y5 yang Digunakan Sebagai Dasar Penentuan Standar Penggunaan HPU
Bookmark Share

Art Original

Evaluasi Penerapan Hydraulic Pumping Unit pada Sumur-sumur Berlaju Alir Rendah untuk Mempertahankan Produksi Minyak di Sumur X1, X2 Dan Y5 yang Digunakan Sebagai Dasar Penentuan Standar Penggunaan HPU

Ema Febriyanti - Personal Name; Ali Musnal - Personal Name;

Wells X1, X2 and Y5 are production wells that use artificial lift by applying ESP as an option for the pump to be used. Along with the production, the resulting production is not as expected where wells X1, X2 and Y5 often experience problems, where the ESP pump cannot work with good performance. This is due to the inability of the formation to supply fluid in accordance with the predetermined production rate from the results of the production calculation test, this causes the pump to often experience fluid not support. By applying the Hydraulic Pumping Unit as an artificial lift in the X1, X2 and Y5 wells, it is hopedthat later it can improve the performance of the production of the X1, X2 and Y5 wells which have decreased, and it is hoped that production rate analysis using decline curve analysis can provide an idea of how much well oil production is. X1, X2 and Y5 which will continue and the same problem will not occur again during the oil production period in the X1, X2 and Y5 wells, and to also be usedas a reference for other wells that have the same character as the well. X1, X2and Y5. For this reason, in wells X1, X2 and Y5, it is necessary to recalculate the maximum production rate and the actual optimum production rate and redesign the calculation for the selection of pumps that will be applied to wells X1, X2 and Y5, and the selected pump is expected to support the production of the X1 well. , X2 and Y5 with low flow rates.


Availability
#
Teknik Perminyakan (Fakultas Teknik) Perminyakan 627.9 WEma e
243625
Available but not for loan - ETD
Detail Information
Call Number
Perminyakan 627.9 WEma e
Language
Indonesia
NPM
163210742
Publisher
Teknik Perminyakan : Universitas Islam Riau., 2023
Keyword(s)
Decline Curve
Fluid Not Support
Hydraulic Pumping Unit
Production
Low Flow
Other Information
Petugas
Uthi Kurnia
Other version/related

No other version available

File Attachment
  • Please login to see this attachment
Comments

You must be logged in to post a comment

ETD - UIR
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2026 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search
Where do you want to share?