ETD - UIR

Electronic Thesis and Dissertation

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Member Area
    Member Login Online Registration
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject NPM Advanced Search

Last search:

{{tmpObj[k].text}}
Image of Analisis Penyebab Stuck Pipe Dan Upaya Mengatasinya Pada Pemboran Di Sumur “h” Lapangan “j”
Bookmark Share

Art Original

Analisis Penyebab Stuck Pipe Dan Upaya Mengatasinya Pada Pemboran Di Sumur “h” Lapangan “j”

Seal Tiel Jiski Simanjuntak - Personal Name; Novrianti - Personal Name;

In a drilling operation, sometimes there are problems that can interfere with drilling activities. One of the problems that occur in drilling operations is stuck pipe, stuck pipe problems occur during operations on route 8 ½” at a depth of 3059 ftMD well “H” field “J”, in general there are three types of stuck pipes namely differential sticking, hole pack-off and well geometry. The cause of stuck pipes in drilling well “H” field “J” is analyzed from aspects of lithology of formation, aspects of borehole geometry, aspects of drilling parameters Weight On Bit (WOB) and aspects of drilling mud (differential pressure). After analysis of several aspects, it is known that the cause of the stuck pipe in the well “H” of the field “J” is differential pressure due to the high density that makes the drill string stick to the formation wall. And from this analysis, it is known that the type of stuck pipe in well “H” field “J” is differential sticking. In this well, the methods to overcome stuck pipes are jars assisted by pull repeatedly and using the spotting fluids method. The problem in well “H” field “J” was successfully solved using the spotting fluids method with 12.5% HCL Acid solution and the effort was successful


Availability
#
Teknik Perminyakan (Fakultas Teknik) Perminyakan 622.3 Sea a
246535
Available but not for loan - ETD
Detail Information
Call Number
Perminyakan 622.3 Sea a
Language
Indonesia
NPM
193210096
Publisher
Teknik Perminyakan : Universitas Islam Riau., 2023
Keyword(s)
Stuck Pipe
Differential Sticking
Hole Pack-Off
Well Geometry
Other Information
Petugas
Uthi Kurnia
Other version/related

No other version available

File Attachment
  • Please login to see this attachment
Comments

You must be logged in to post a comment

ETD - UIR
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2026 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search
Where do you want to share?