ETD - UIR

Electronic Thesis and Dissertation

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Member Area
    Member Login Online Registration
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject NPM Advanced Search

Last search:

{{tmpObj[k].text}}
Image of Analisis Faktor Yang Mempengaruhi Produktivitas Pekerja Pada Proyek  Pembangunan Perumahan Type 70 Asmara Graha Residence Jl. Kapau Sari, Kecamatan Tenayan Raya, Kota Pekanbaru, Provinsi Riau
Bookmark Share

Art Original

Analisis Faktor Yang Mempengaruhi Produktivitas Pekerja Pada Proyek Pembangunan Perumahan Type 70 Asmara Graha Residence Jl. Kapau Sari, Kecamatan Tenayan Raya, Kota Pekanbaru, Provinsi Riau

Figo Fryjude - Personal Name; Deddy Purnomo Retno - Personal Name;

Worker productivity is one of the key factors determining the success of a construction project, particularly in terms of time efficiency, cost management, and work quality. This study aims to analyze the factors influencing worker productivity in the Type 70 housing development project at Asmara Graha Residence, located on Jalan Kapau Sari, Tenayan Raya District, Pekanbaru City, Riau Province. The research method used is a quantitative approach with survey techniques conducted through questionnaire distribution to project workers, followed by data analysis using SPSS software. The research findings indicate several significant factors affecting worker productivity, including work motivation, work discipline, work environment, and labor management systems. The motivation factor includes worker welfare, wages received, and the relationship between workers and supervisors. The discipline factor consists of punctuality, adherence to standard operating procedures (SOPs), and awareness of occupational safety. Meanwhile, the work environment factor includes workplace comfort, air circulation, and teamwork among workers. Based on the analysis results, several strategies can be implemented to enhance worker productivity in this construction project. These include improving labor management systems, implementing regular training programs, strengthening communication between workers and management, and providing performancebased incentives. The implementation of these strategies is expected to increase work efficiency, accelerate project completion, and optimize the quality of the housing development.


Availability
#
Teknik Sipil (fakultas teknik) Teknik sipil 657.1 Fig A
252371
Available but not for loan - ETD
Detail Information
Call Number
-
Language
NPM
203110459
Publisher
Teknik Sipil : Universitas Islam Riau., 2025
Keyword(s)
Worker Productivity, Construction Project, Work Mo
Other Information
Petugas
ilham
Other version/related

No other version available

File Attachment
  • Please login to see this attachment
Comments

You must be logged in to post a comment

ETD - UIR
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2026 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search
Where do you want to share?