ETD - UIR

Electronic Thesis and Dissertation

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Member Area
    Member Login Online Registration
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject NPM Advanced Search

Last search:

{{tmpObj[k].text}}
Image of Analisis Keekonomian Pengembangan Lapangan “bmh” Berdasarkan Skema Psc Cost Recovery Dan Psc Gross Split
Bookmark Share

Art Original

Analisis Keekonomian Pengembangan Lapangan “bmh” Berdasarkan Skema Psc Cost Recovery Dan Psc Gross Split

Bimantoro Hasibuan - Personal Name; Muhammad Ariyon - Personal Name;

The “BMH” field has produced approximately 1,396 MMSTB from 1975 to 2012, with an oil yield (RF) rate of 31%. To develop the field over the next 20 years, 4 scenarios have been simulated, with oil recovery rates (RF) increasing to 33.7%, 34.6%, 35.4%, and 37.6% for each of them. To obtain optimal benefits, an economic analysis will be carried out by assessing the feasibility of each field development scenario. New regulations in Ministerial Regulation no. 12 of 2020 gives investors or contractors the option to choose between using PSC Cost Recovery or PSC Gross Split. Researchers will evaluate investments with both systems using indicators such as NPV IRR and POT. Sensitivity analysis will also be carried out by considering the decrease or increase in the values of relevant parameters. From the results of the calculations carried out on economic indicators, the Gross Split contract gets a better value when compared to the PSC Cost Recovery contract in each scenario. Scenario 1 PSC Gross Split is the best scenario with NPV, IRR and POT 1.07 MMUS$, 69% and 0.89 years. The parameter that has the most influence on the sensitivity graph is CAPEX followed by oil prices, production size and OPEX on PSC Cost Recovery. Meanwhile, in PSC Gross Split, the most influential factors are oil production and prices, followed by CAPEX and OPEX.


Availability
#
Teknik Perminyakan (fakultas teknik) Teknik perminyakan 658.57 Bim A
252383
Available but not for loan - ETD
Detail Information
Call Number
-
Language
NPM
193210344
Publisher
Teknik Perminyakan : Universitas Islam Riau., 2025
Keyword(s)
-
Other Information
Petugas
ilham
Other version/related

No other version available

File Attachment
  • Please login to see this attachment
Comments

You must be logged in to post a comment

ETD - UIR
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2026 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search
Where do you want to share?