ETD - UIR

Electronic Thesis and Dissertation

  • Home
  • Information
  • News
  • Help
  • Librarian
  • Member Area
    Member Login Online Registration
  • Select Language :
    Arabic Bengali Brazilian Portuguese English Espanol German Indonesian Japanese Malay Persian Russian Thai Turkish Urdu

Search by :

ALL Author Subject NPM Advanced Search

Last search:

{{tmpObj[k].text}}
Image of Perencanaan Workover Fluid dalam Penanganan  Well Kick pada Pekerjaan Prerforasi Zona Bar8u Mengguakan Metode Concurrent dan Metote Bulheading di Sumur M Lapangan r
Bookmark Share

Text

Perencanaan Workover Fluid dalam Penanganan Well Kick pada Pekerjaan Prerforasi Zona Bar8u Mengguakan Metode Concurrent dan Metote Bulheading di Sumur M Lapangan r

M.Ramadan - Personal Name; Fitrianti - Personal Name;

Well M field R is one of the wells located in the Rokan Working area. Where this well is an old well that wants to be reactivated by adding new perforation zones at intervals of 5,000 ft - 5,100 ft. In carrying out this work, formation pressure analysis is very necessary so that the activity of adding new perforation zones can run well and smoothly. The initial formation pressure in the well was 2,166 psi with a hydrostatic pressure of 2,253 psi. This means that the well is not experiencing a kick. However, after the new zone perforation work was carried out, the formation pressure which was initially 2,166 psi increased to 2,300 psi. causes formation pressure to be greater than hydrostatic pressure, namely 2,300 psi > 2,253 psi. The greater the formation pressure than the hydrostatic pressure indicates that the well is experiencing a kick problem. Workover fluid planning for the M well in the R field consists of 2 types of calculations, namely concurrent calculations and bullheading calculations. In concurrent calculations, to resist a formation pressure of 2,300 psi a kill weight fluid of 8.85 ppg is required with a total workover fluid volume of 235 bbl and a total stroke of 7,070 stk and requires a pumping time of 236 minutes. Meanwhile, in the bullheading calculation, to resist a formation pressure of 2,300 psi, a kill fluid weight of 8.85 ppg is required with a total workover fluid volume of 101 bbl and a total stroke of 3,040 stk and requires a pumping time of 102 minutes. If you look at the results, bullheading calculations are more profitable than concurrent calculations. However, if you look at the condition of the well, these two calculations are very different. This is because concurrent calculations are carried out when well conditions allow a circulation system to be implemented. Meanwhile, bullheading calculations are carried out when well conditions do not allow for a circulation system.


Availability
#
Teknik Perminyakan (Fakultas Teknik) Perminyakan 551.48 Ram p
240099
Available
Detail Information
Call Number
Perminyakan 551.48 Ram p
Language
Indonesia
NPM
193210263
Publisher
Pekanbaru : Universitas Islam Riau., 2023
Keyword(s)
workover fluid, kill weight fluid, bullheading met
Other Information
Petugas
Yolla Afrina
Other version/related

No other version available

File Attachment
  • Please login to see this attachment
Comments

You must be logged in to post a comment

ETD - UIR
  • Information
  • Services
  • Librarian
  • Member Area

About Us

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Search

start it by typing one or more keywords for title, author or subject

Keep SLiMS Alive Want to Contribute?

© 2026 — Senayan Developer Community

Powered by SLiMS
Select the topic you are interested in
  • Computer Science, Information & General Works
  • Philosophy & Psychology
  • Religion
  • Social Sciences
  • Language
  • Pure Science
  • Applied Sciences
  • Art & Recreation
  • Literature
  • History & Geography
Icons made by Freepik from www.flaticon.com
Advanced Search
Where do you want to share?