In a drilling operation, sometimes there are problems that can interfere with drilling activities. One of the problems that occur in drilling operations is stuck pipe, stuck pipe problems occur during operations on route 8 ½” at a depth of 3059 ftMD well “H” field “J”, in general there are three types of stuck pipes namely differential sticking, hole pack-off and well geometry. The c…